On Saturday, May 28, 2011 at 8:47 PM, 6 Companies of Los Angeles Firefighters, 2 LAFD Rescue Ambulances, 1 Arson Unit, 1 EMS Battalion Captain, 2 Battalion Chief Officer Command Teams, 1 Division Chief Officer Command Team, 1 Emergency Air Unit all under the direction of Assistant Chief Daryl Arbuthnott responded to a Structure Fire at 1000 Elysian Park Avenue in Echo Park.

Los Angeles Firefighters arrived to find a moderate amount of lazy smoke drifting across the Top Deck of Dodger Stadium. Firefighters swiftly made their way through crowds of baseball fans while additional colleagues entered the Stadium from an aerial ladder truck.

A small fire comprised predominately of paper goods was located inside an approximate 20' x 20' storage room, made of cinder block construction.

Some fans seated in the Top Deck were calmly moved to another area due to residual smoke, but there was no need for a formal evacuation of the stadium, and play was not stopped. Dodger's staff addressed the public stating "Attention Please: There was a small fire in a confined area that is under control and contained. The Los Angeles Fire Department is onscene and there is no need to evacuate."

Due to the prompt response of 42 Los Angeles Firefighters the flames were confined to the area of origin and fully extinguish in just 20 minutes before anyone was injured. Careful preservation was given to protecting Dodger property and gas powered blowers were strategically utilized to direct remaining smoke away from fans.

The estimated dollar loss is $20,000 ($5,000 property and $15,000 contents). The cause of the fire is under active investigation.

(Home Video)

Submitted by Erik Scott, Spokesman
Los Angeles Fire Department
0 komentar

Blog Archive